Uncategorized
Rock Street – Temporary Road Closure 9-Oct-2025
Please follow the link to view the above road closure; https://one.network/?tm=144373441 and the link for the Notice 2: https://api-gb.one.network/downloads/tm/1111/03-notice-2_144373441_3963318_4c460fe3fd.pdf The order becomes effective on 09th October 2025 and will remain in force for eighteen months. The works are expected to commence on 13th October 2025 and last for 3 days to enable Bristol Water to install a new water connection. Read more